| End of Week Three Progress |
|
|
|
| Saturday, 30 January 2010 23:20 |
|
As week three rolls around, the pace quickens around the Cheesy Poof Lab. Design work continued on ball manipulation systems and tower suspension systems. These designs are going through hundreds of iterations to yield the simplest and most effective design. Manufacturing continues at a rapid pace. The drivetrain parts have been mostly manufactured and are awaiting final assembly. As parts start to return from sponsors, the robot begins to take shape at a basic level. |